NIC streets closed temporarily due to gas leak


9:55 a.m. Sept. 12, 2011

Gas leak fixed, NIC streets reopened

The gas line that was struck by construction crews on the site of the Education Corridor TODAY, Sept. 12 has been repaired. Traffic and pedestrian access via River Avenue and College Drive have been resumed.

 

8:40 a.m.

NIC streets closed temporarily due to gas leak

A gas line was struck by construction crews working on the site of the Education Corridor this morning. Avista crews are currently working to stop the leak and repair the line.

Vehicle and pedestrian traffic is being restricted in the area of the roundabout at College Drive and River Avenue. River Avenue is closed from Hubbard west and College Drive is closed from Garden Avenue north, restricting access to the Meyer Health and Sciences Building, Winton Hall, Post Hall, Timber Hall, and the River Building.

An update will be sent when the leak has been repaired and streets are reopened on North Idaho College’s campus.



Posted: Monday, Sept. 12, 2011

Email

Links


Find us on:
Go To Our Facebook Page Go To Our Twitter Page Go To Our Instagram Page Go To Our You Tube Videos Page Go To Our Flickr Photos Page

NIC Communications and Marketing Contacts


Tom Greene,
Communications Coordinator
(208) 665-2759 or tom_greene@nic.edu

Stacy Hudson,
Communications and Marketing Director
(208) 769-7819 or stacy_hudson@nic.edu

Mark Browning, Vice President for Community Relations and Marketing
(208) 769-3316 or mark_browning@nic.edu

News Search



Archives